INTRODUCTION

    Dingli biomass dry distillation carbonization furnace is composed of a carbonization furnace body, furnace cover, inner tank, material cage, combustible gas return pipe, exhaust pipe, flue gas dust removal device, tank lifting device, and thermometer.

    The furnace adopts the principle of anaerobic dry distillation to remove the volatile substances in the biomass and achieve the purpose of biomass carbonization. 

     Widely used for: coconut shells,sawdust,wood chips,wood, logs, shells, straw,rice husk,bamboo and other different shapes of biomass raw materials carbonized.

    Carbonization process has four steps: charging sealing furnace - preheat drying - anaerobic carbonization - cooling carbon.

Biomass Vertical Carbonization Stove
Biomass Vertical Carbonization Stove
Biomass Vertical Carbonization Stove

PRINCIPLE

Whatsapp: +86 166-9785-3276

 The carbonization process has four steps: charging sealing furnace - preheat drying - anaerobic carbonization - cooling carbon. A charging sealing furnace is putting the biomass core rods, shells, and other materials into the cage. The cage is divided into two or three layers. in turn the inner tank, cover, lock the buckle, lifting the charging tank into the furnace. Preheat drying in the furnace with wood and other fuel heating, slowly heated from room temperature to 220-250 ℃, the processing time 1.2-2.0 hours (according to the material moisture content, density, particle size determines the specific heating time), and discharge the material moisture and the air in the tank. Anaerobic carbonization is the furnace temperature to the beginning of weak yellow smoke in the smoke pipe (hydrogen and other volatile substances) discharge, that is the beginning of carbonization, recovery of combustible gas into the furnace ignition, adjusting intake air, maintaining the tank temperature 300-450 ℃ for 2.0-3.5 hours (according to the carbonized material density, particle size, and carbonization depth requirements determine the specific temperature and carbonization time). When the furnace is natural flameout, namely for the end of carbonization. Cooling out the carbon is hanging out of the tank from the furnace, into the cooling area of natural cooling or spray water cooling, until the inner tank temperature dropped to below 50 ℃, then open the cover out of charcoal. The total furnace temperature and carbonization time are 3.5-5.5 hours. It can complete 3-6 furnace times in 24 hours. Exhaust gas through dust collector treatment to reach discharge standards. 3 sets of carbonization furnaces in parallel use, peak shifting carbonization, which can be completely used volatile gas heating carbonization furnace, without using additional fuel.

PARAMETERS

Model CAPACITY DIAMETER HEIGHT MATERIAL(m)
DLTL-300 300kg/4-6h 1.45m 1.85m Carbon steel, refractory
DLTL-500 500kg/4-8h 1.8m 1.9m Carbon steel, refractory
DLTL-1000 1000kg/5-8h 2.15m 2.2m Carbon steel, refractory

LEAVE US A MESSAGE.