Whatsapp: +86 166-9785-3276

Dingli company’s technicians summed up some problems and solutions during dryer work based on their years installed experience.



First, materials not expected to go.
Reason:
1. Drying equipment is improper installation. Gas leakage or the installation is wrong.
2. Drying equipment has problems on design. Wind pressure is not enough.
Solution:
1. Examine the problems at the installation based on installation drawings. Check whether the pipeline interfaces leaking.
2. Manufacturers solve the problem.

Second, separator chimney discharged.
Reason:
1. Separator is too small.
2. Separator design has problems.
3. Wind pressure calculation is error.
Solution:
1. Replace or modified separator.
2. Consultation with the factory.

Third, drying equipment fuel is wasted.
Reason:
1. Equipment is poor on insulation properties.
2. Device design principles have problems.
3. Furnace’s design or manufacture has problems.
Solution:
1. Pack a layer of insulating material. Improve the working conditions of drying equipment.
2. Request improvement the factory.
3. Obtain more reasonable stove drawings for factory.

If you have problems, you can contact Dingli company’s sale staff. We will sincerely provide you with the best service!

Leave Us A Message

We will give you customized Proposal & Quotation within 24 hours.

LATEST NEWS

Whatsapp: +86 +86 166-9785-3276

LEAVE US A MESSAGE

Welcome to discuss your project requirements, We will give you customized Proposal & Quotation within 24 hours.